Magzter Gold (Sitewide CA)
Model Engineer (Digital)

Model Engineer (Digital)

1 Issue, Issue 4757

Another Steam Plant PART 3

Another Steam Plant PART 3
Continued from p.716 M.E.4756 November 15 Having assembled the engine and discussed some of the accessories and components I intend using on my steam plant, I am now at the stage of positioning everything on a ‘dummy board’ and making and connecting the necessary pipework. The practical layout of the components confirms there is plenty of space between the parts and helps in determining the shape and bends in the pipework. The pipework should be neat and the connections should fit correctly when finally mounted on the actual board. The dummy board was made the same size as the actual board intended for the finished plant and the boiler and water tank were the first items to be secured in place. All the components must be securely fastened to the…
You're reading a preview of
Model Engineer (Digital) - 1 Issue, Issue 4757

DiscountMags is a licensed distributor (not a publisher) of the above content and Publication through Zinio LLC. Accordingly, we have no editorial control over the Publications. Any opinions, advice, statements, services, offers or other information or content expressed or made available by third parties, including those made in Publications offered on our website, are those of the respective author(s) or publisher(s) and not of DiscountMags. DiscountMags does not guarantee the accuracy, completeness, truthfulness, or usefulness of all or any portion of any publication or any services or offers made by third parties, nor will we be liable for any loss or damage caused by your reliance on information contained in any Publication, or your use of services offered, or your acceptance of any offers made through the Service or the Publications. For content removal requests, please contact Zinio.

© 1999 – 2025 DiscountMags.com All rights reserved.