Magzter Gold (Sitewide CA)
Model Engineer (Digital)

Model Engineer (Digital)

1 Issue, Issue 4750

PART 4 The Leufortin Project

PART 4 The Leufortin Project
Continued from p.255 M.E.4749 August 9 Chassis assembly Wheels were fitted and secured as detailed at the correct back to back distance. The gear had been keyed and fitted. Finally Leufortin 1 is up on own legs (photo 22). The fly cranks quartered well and were just temporarily grub-screwed (for any adjustment). This was based on the view that this was the slowest part of the transmission and would last long enough to check the running before the final strip down ready to paint. The same judgment was made for plain axle box bearings in brass, well lubricated. The subsequently infamous forward/reverse gear tumbler mechanism had to be assembled and installed with the jackshaft into the chassis. The jackshaft went in with its gears and tumbler assembly. Gear meshing was…
You're reading a preview of
Model Engineer (Digital) - 1 Issue, Issue 4750

DiscountMags is a licensed distributor (not a publisher) of the above content and Publication through Zinio LLC. Accordingly, we have no editorial control over the Publications. Any opinions, advice, statements, services, offers or other information or content expressed or made available by third parties, including those made in Publications offered on our website, are those of the respective author(s) or publisher(s) and not of DiscountMags. DiscountMags does not guarantee the accuracy, completeness, truthfulness, or usefulness of all or any portion of any publication or any services or offers made by third parties, nor will we be liable for any loss or damage caused by your reliance on information contained in any Publication, or your use of services offered, or your acceptance of any offers made through the Service or the Publications. For content removal requests, please contact Zinio.

© 1999 – 2025 DiscountMags.com All rights reserved.